At Titus' request I modified the grade at El Cambio to rise a little faster so the big bridge would clear.
Friday, February 18, 2011
Subscribe to:
Post Comments (Atom)
This is a small mining layout based on a real 30" railroad. Follow along as we design the layout.
No comments:
Post a Comment